Project Scope: Capacity increase (Upgrading) of 2 concrete cells of the CT-505 Concrete Cooling Tower of the alkylation area, total circulating water flow 20,000 GPM.
Supply of materials, dismantling, civil works, electrical works, electromechanical works, instrumentation and lighting of the tower. Engineering for the selection of mechanical equipment, thermodynamic design, installation of equipment and materials, performance tests and commissioning.
Project Scope: Supply and installation of a fiberglass cell, induced draft counterflow. Total circulating water flow, 10,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, installation of the tower, assembly of internals, electromechanical installation, performance testing and commissioning.
Project Scope: Supply and installation of 3 cells in pultruded fiberglass FRP counterflow induced draft, total circulating water flow 33,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, installation of the tower, assembly of internals, electromechanical installation, performance testing and commissioning.
Project Scope: Assembly of 12 cells of pultruded fiberglass FRP, Induced Draft Counterflow.
Assembly of 12 pultruded fiberglass cells for an Induced Draft Counterflow Cooling Tower, internal assembly, electromechanical installation and commissioning.
Project Scope: Supply and installation of 2 cells of pultruded fiberglass FRP, induced draft counterflow, total circulating water flow 4757 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internal assembly, installation of the tower, electromechanical installation, performance testing and commissioning.
Project Scope: Overhaul of 4 cells of the Cooling Tower T-4361 A / B / C / D induced draft counterflow, total flow 41,210 GPM.
Disassembly, basic engineering, supply of materials, design of the tower structure, thermodynamic design, installation of the tower, internals assembly, electromechanical installation, performance testing and commissioning.
Project Scope: Supply and installation of 5 Cooling Towers type counter flow induced draft pultruded fiberglass FRP, total circulating water flow 10,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internals assembly, installation of the tower, electromechanical installation, performance testing and commissioning.
Project Scope: Supply of materials and installation of an induced draft counterflow hydraulic concrete cell, total capacity 7,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internals assembly, installation of the tower, electromechanical installation, performance testing and commissioning.
Project Scope: Supply and installation of 2 cells in pultruded fiberglass FRP, total circulating water flow 15,750 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, installation of the tower, internals assembly, electromechanical installation, performance testing and commissioning.
Project Scope: Supply and installation of 8 cells in treated wood, total circulating water flow 48,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internals assembly, installation of the tower, electromechanical installation, performance testing and commissioning.
Project Scope: Supply, construction and installation of 5 hydraulic concrete cells, total circulating water flow 61,640 GPM.
Engineering, supply, design of the tower structure, thermodynamic design and basic and detailed concrete engineering for five cells, performance tests, design of the fire protection system, construction and installation of the tower, internals assembly, electromechanical installation, commissioning, construction of basin and concrete structure.
Project Scope: Supply of materials and installation of 7 cells made of treated wood, total circulating water flow 45,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internals assembly, installation of the tower, electromechanical installation, performance testing and commissioning.
Project Scope: Dismantling, supply and installation of 6 cells in pultruded fiberglass FRP, total circulating flow 37,000 GPM.
Disassembly, engineering, supply of materials, design of the tower structure, thermodynamic design, installation of the tower, internals assembly, electromechanical installation, performance testing and commissioning.
Project Scope: Supply and installation of 3 cells in pultruded fiberglass FRP, total circulating water flow 12,000 GPM.
Engineering, supply of materials, design of the tower structure, thermodynamic design, internals assembly, installation of the tower, electromechanical installation, performance testing and commissioning.